Arvou
LY-049S Curved Modern Boneless Sofa Loveseat Backrest Upgrade 2-Seater Green Chenille Compression Couch With 3 Pillows Minimalist Modular Couches For Living Room Office Apartment Guest Room
LY-049S Curved Modern Boneless Sofa Loveseat Backrest Upgrade 2-Seater Green Chenille Compression Couch With 3 Pillows Minimalist Modular Couches For Living Room Office Apartment Guest Room
Couldn't load pickup availability
Specification
Product Information
Item Code:W2231P402441
Product Type :Single Box Product
Product Name:LY-049S Curved Modern Boneless Sofa Loveseat, Backrest Upgrade, 2-Seater Green Chenille Compression Couch with 3 Pillows, Minimalist Modular Couches for Living Room, Office, Apartment, Guest Room
Main Color:Green
Main Material:Chenille,Foam
Product Dimensions
Assembled Length (in.):67.32
Assembled Width (in.):40.94
Assembled Height (in.):27.56
Product Weight (lbs.):71.87
Package Size
Length (in.):20.87
Width (in.):20.87
Height (in.):38.58
Weight (lbs.):78.48
Product Features
- Optimized Compact Design: Space-saving 65" L × 39.4" W profile fits corners, narrow rooms, or studios.
- Luxurious Chenille Fabric: Velvet-soft upholstery resistant to pilling and daily wear.
- 30-Density Compressed Foam with Spring System & Non-Slip Dot-Grip Fabric
- Includes 3 Decorative Pillows: Standard 14.17" × 14,17" (36 × 36 cm) pillows complement the sofa's design.
- Sofa Dimensions: 65" L × 39.4" W × 27.17" H

Product information
| Material | ["Others"] |
|---|---|
| Weight | 35598 g |
| Packing | ["Carton"] |
| Category | Home, Garden & Furniture / Home Storage / Furniture |
